Waste Control Audit Checklist

Waste Control Audit Checklist

(Applied for ISO 22000)

1. How does the organization control waste?

2. Are there sufficient waste control facilities in production area?

3. Is waste been removed periodically from the production/storage areas adequate to prevent contamination?

4. How does the organization treat the waste?

5. Does the waste disposal method comply with any relevant regulations?

Related documents:

. ISO 22000 checklist

. ISO 22000 standard

Share This Post

Recent Articles

Leave a Reply

© 2017 Quality Management. All rights reserved. Site Admin · Entries RSS · Comments RSS
Powered by WordPress · Designed by Theme Junkie