5S shine requirements
5S shine requirements
1. Floors are free from dirt, debris, oil, parts, hardware, empty boxes, packaging material, etc. Drains (if required) are properly located and unclogged.
2. Walls, partitions, railings, etc. are painted and kept clean.
3. There is a schedule showing times, frequency and responsibilities to clean areas of the workplace such as windows, corners, walls, doors, top of cabinets, etc.
4. All cleaning equipment is neatly stored and is readily available when needed.
5. Containers, boxes, bins, etc. are clean and not cracked, torn, or otherwisedamaged. They are neatly stacked.
6. Tools are kept clean and in good working order. Where possible, tools are stored in a manner to keep them clean and free from risk of damage.
7. Paperwork is not torn, kept clean and protected from dirt.
8. Work surfaces (machines, workbenches, dies, and other equipment including electrical boxes) are clean and painted.
Related documents:
• 5S implementation
• 5S checklist
• 5S standard
• 5S training
• 5S audit certification
• 5S books and templates
• 5S services
Advertisement
Sponsor sites:
1. Phrases For Performance Appraisals.
2. Interview questions and answers.
This entry was posted
on Friday, September 25th, 2009 at 12:47 pm and is filed under 5s implementation.
You can leave a response, or trackback from your own site.

