5S shine requirements

5S shine requirements

1. Floors are free from dirt, debris, oil, parts, hardware, empty boxes, packaging material, etc. Drains (if required) are properly located and unclogged.

2. Walls, partitions, railings, etc. are painted and kept clean.

3. There is a schedule showing times, frequency and responsibilities to clean areas of the workplace such as windows, corners, walls, doors, top of cabinets, etc.

4. All cleaning equipment is neatly stored and is readily available when needed.

5. Containers, boxes, bins, etc. are clean and not cracked, torn, or otherwisedamaged. They are neatly stacked.

6. Tools are kept clean and in good working order. Where possible, tools are stored in a manner to keep them clean and free from risk of damage.

7. Paperwork is not torn, kept clean and protected from dirt.

8. Work surfaces (machines, workbenches, dies, and other equipment including electrical boxes) are clean and painted.

Related documents:

5S implementation
5S checklist

Find more quality documents by using categories at sidebar

Useful quality materials related:
_Download ISO 9000 Standards from ANSI.
_ISO 9000 checklist - Over 30 checklists for auditing ISO 9000.
_ISO 9000 procedures - Over 10 procedures for implementing ISO 9000.
_5S checklist - 10 checklists for auditing 5S standard etc.
_Quality management books - All books of quality management in the world.

Leave a Reply

Comment moderation is enabled. Your comment may take some time to appear.