Design and development review in AS9100 standard

Design and development review in AS9100 standard
Clause 7.3.4

At suitable stages, systematic reviews of design and development shall be performed in accordance with planned arrangements (see 7.3.1)

a) to evaluate the ability of the results of design and development to meet requirements, and

b) to identify any problems and propose necessary actions, and

c) to authorize progression to the next stage.

Participants in such reviews shall include representatives of functions concerned with the design and development stage(s) being reviewed

Records of the results of the reviews and any necessary actions shall be maintained (see 4.2.4).

Related documents

. AS 9100 standard

Advertisement

Sponsor sites:

1. Phrases For Performance Appraisals.

2. Interview questions and answers.
This entry was posted on Monday, January 11th, 2010 at 3:15 pm and is filed under AS 9100 standard. You can leave a response, or trackback from your own site.

Leave a Reply

*

Comment moderation is enabled. Your comment may take some time to appear.