Design and/or Development Verification Checklist
Design and/or Development Verification Checklist
1. Is design and/or development verification performed to ensure the output meets the design and/or development inputs?
2. Are the results of the verification and subsequent follow-up actions recorded?
Related documents:
1. All ISO 9001 checklist
Advertisement
Sponsor sites:
1. Phrases For Performance Appraisals.
2. Interview questions and answers.
This entry was posted
on Saturday, September 26th, 2009 at 12:51 pm and is filed under ISO 9001 audit.
You can leave a response, or trackback from your own site.

