General ISO/TS 16949 checklist of measurement, analysis and improvement
General ISO/TS 16949 checklist of measurement, analysis and improvement
Clause 8.1
8.1.1 Has the organization planned and implemented the monitoring, measurement, analysis and improvement processes needed
a) to demonstrate conformity of the product?
b) To ensure conformity of the quality management system?
c) To continually improve the effectiveness of the quality management system?
8.1.2 Has the organization determined the applicable methods and the extent of their use for its monitoring, measurement, analysis and improvement processes?
8.1.1 IDENTIFICATION OF STATISTICAL TOOLS
8.1.3 Does the organization determine the appropriate statistical tools for each process during advance quality planning and included in the control plan?
8.1.2 KNOWLEDGE OF BASIC STATISTICAL CONCEPTS
8.1.4 Does the organization understand basic statistical concepts , such as variation, control (stability), process capability and over-adjustment?
8.1.5 Does the organization utilize basic statistical concepts throughout its establishment?
Related documents:
Advertisement
Sponsor sites:
1. Phrases For Performance Appraisals.
2. Interview questions and answers.
This entry was posted
on Saturday, November 21st, 2009 at 9:31 am and is filed under ISO/TS16949 checklist.
You can leave a response, or trackback from your own site.

