ISO 17025 audit checklist about Control of Non-confirming (NC) Testing and/or Calibration Work

ISO 17025 audit checklist about Control of Non-confirming (NC) Testing and/or Calibration Work
Clause 4.9

1 What are the policy & procedure on the control of non-confirming test?

2 How does the lab handle the NC material/test/instrument?

3 Is there any record on corrective action?

4 Who’s responsible to verify the corrective action?

5 Do the lab notify their client and where is the record?