Quality management system planning in AS9100 standard
Quality management system planning in AS9100 standard
Clause 5.4.2
Top management shall ensure that
a) the planning of the quality management system is carried out in order to meet the requirements given in 4.1, as well as the quality objectives, and
Top management shall ensure that
b) the integrity of the quality management system is maintained when changes to the quality management system are planned and implemented.
Quality planning for software shall occur at two levels:
- the organizational level; and
- the project/product level.
At the organizational level, software quality system planning shall identify:
a. software life cycle models to be used for the types of projects that the organization undertakes;
b. how the organization normally implements software life cycle processes;
c. how software engineering methods are tailored for the organization’s projects within the life cycle;
d. any common templates for assisting the development of software products, such as software requirements documents, architectural design documents, detailed design documents, source code headers, and software user manuals;
e. software management planning such as technical, cost, and schedule planning, configuration management planning, verification and validation planning, safety, security and quality assurance planning;
f. tools and software/systems development, operations or maintenance environment;
g. conventions for the use of programming languages and software libraries.
At the project/product level, quality planning is discussed in clause 7.1.
Related documents
Advertisement
Sponsor sites:
1. Phrases For Performance Appraisals.
2. Interview questions and answers.
This entry was posted
on Wednesday, December 30th, 2009 at 11:05 am and is filed under AS 9100 standard.
You can leave a response, or trackback from your own site.

