Steps to do Seiso
Steps to do Seiso
1. Determine Shine targets
• Storage space, Equipment or Empty Space
2. Determine Shine assignments
• Divide job based on area of cleaning
• Divide job based on time of cleaning
3. Determine Shine Methods
• Choose the right tools
• Shining should take 5 minutes
• How much to shine should be defined
4. Prepare tools
• Keep tools near location of shine
5. Start to Shine
• Clean thoroughly
Related docs to 5S
• 5S implementation
• 5S checklist
• 5S standard
• 5S training
• 5S audit certification
• 5S books and templates
• 5S services
Advertisement
Sponsor sites:
1. Phrases For Performance Appraisals.
2. Interview questions and answers.
This entry was posted
on Friday, September 25th, 2009 at 12:05 am and is filed under 5S overview.
You can leave a response, or trackback from your own site.

